Yemen — Flood Update 26 April 2022 - Ma’rib

Contact
DTM Yemen, iomyemendtm@iom.int
Language
English
Location
Yemen
Period Covered
Apr 25 2022
Apr 26 2022
Activity
  • Displacement Solutions
  • Rapid Emergency Registration
  • Mobility Tracking

Summary

IOM DTM visited two sites in Ma’rib District on 26 April 2022 to verify reports of flooded displacement camps. DTM found

that approximately 100 households were affected by rains that severely damaged camp structures. The families are in need of

food, shelter and non-food items. As of the time of reporting no humanitarian support has been provided.

The two main affected sites are Abu Janab and Al Rweik Al Sharqi , which are located approximately 125km or 2.5 hours by

car from Ma’rib city.