Afghanistan — Drought Response Situation Report (8 March 2019)

Contact
DTMAfghanistan@iom,int
Language
English
Location
Afghanistan
Period Covered
Sep 09 2018 -
Mar 08 2019
Activity
  • Flow Monitoring

Summary

Through Flow Monitoring Points (FMPs) installed on major routes connecting to Herat City, IOM’s Displacement Tracking Matrix (DTM) has been monitoring inflows of drought-affected IDPs, since 9 September 2018. This report presents cumulative information as of 8 March 2019.

Give us your feedback

Image CAPTCHA